Multi-unit developments rely on stair packages that are accurately priced, delivered in line with the construction programme and documented consistently across every building.
Aussie Stairs works with developers across WA and NT to manufacture and deliver stair and balustrade packages for townhouse developments, apartments, mixed-use projects and commercial buildings.
We manage your stairs, balustrades, handrails and treads as one coordinated package, giving your team a single point of contact from approved shop drawings through to supply or installation.
Price the Package by Unit Type
Matching stair configurations are grouped to provide a clearer basis for budgeting and procurement.
Deliver in Stages
We'll agree delivery stages around your construction programme so completed stairs arrive when each building is ready, reducing site storage and unnecessary handling.
Compliance Before Fabrication
Before fabrication begins, we review the approved drawings against the relevant NCC requirements and Australian Standards. Resolving compliance before fabrication helps prevent the same issue from being repeated across multiple units.
One Team, One Package
Stairs, balustrades, handrails and treads are managed by our team, giving you one point of contact throughout the project.
Backed by more than 400 five-star Google reviews, we deliver stair and balustrade packages with the same focus on quality, communication and service that's earned the trust of homeowners, builders and trade partners across WA.
Accurate pricing depends on a clearly defined project scope.
We'll review your architectural drawings, identify matching stair configurations and prepare pricing that separates standard configurations from feature stairs, common areas and other project-specific items.
You'll have a clearer understanding of the stair package before construction begins and a simpler way to assess design changes as the project develops.
If the design changes before fabrication, we'll review the drawings, update the documentation and confirm any changes to pricing or delivery before production begins.

.jpeg)
Sending every staircase to site at the same time creates unnecessary storage, increases handling and exposes finished components before they're needed.
We'll work with your programme to stage deliveries around each building or construction phase, keeping the project moving while reducing the risk of damage before installation.
The delivery schedule is agreed before production begins, so your project team knows what is arriving, when it is arriving and where it fits within the broader programme.
Compliance issues become more expensive as developments grow. A single issue repeated across multiple buildings can delay certification and create avoidable rectification work.
Before fabrication begins, we review your drawings against the relevant National Construction Code requirements and Australian Standards.
Barrier design requires particular attention where the applicable NCC provisions restrict climbable elements on barriers protecting a fall of more than four metres. Resolving those details before fabrication helps prevent the same issue from being repeated across the project.

Standard units often sit alongside upgraded apartments, display suites and common areas.
We'll help you coordinate those variations within the same stair package. That might include feature stairs at the entry, upgraded balustrades in penthouses or different handrail finishes.
If the specification changes during design development, we'll review the package before fabrication begins and update the documentation where required.

Our Perth workshop gives us direct oversight of manufacturing, quality and scheduling across multi-unit projects. Every repeated stair, balustrade and handrail needs to match the approved drawings, regardless of when it's installed.
Finished staircases often carry site traffic well before practical completion, making protection an important part of project planning.
We'll help you determine the most suitable protection strategy for your project. Temporary treads or staged installation of selected finishes may be suitable, depending on the stair system and construction sequence.


Some developers prefer supply-only, while others want us to manage installation as part of the package.
At Aussie Stairs, supply-only is available Australia-wide for projects with established site teams. Across Perth and Darwin, supply and installation can be delivered as part of the same package.
During quoting, we'll recommend the delivery model that best suits your programme, site resources and procurement strategy.
We’ll get back to you shortly. For a quick callback without filling in your details, press here.
08 6153 5353
sales@aussiestairs.com
WA (Perth)
23 Carole Road,
Maddington, 6109
NT (Darwin)
65 Cypress Rd,
Humpty Doo, 0836
Opening Hours-
Monday-8 am-5:30 pm
Tuesday-8 am-5:30 pm
Wednesday-8 am-5:30 pm
Thursday-8 am-5:30 pm
Friday-8 am-5:30 pm
Saturday-8 am-1 pm
WA (Perth)
23 Carole Road,
Maddington, 6109
NT (Darwin)
65 Cypress Rd,
Humpty Doo, 0836
Opening Hours-
Monday- Friday: 8 am-5:30 pm
Saturday: 8 am-1 pm
Contact For Complains
We strive to ensure your satisfaction. For any inquiries, reach out to our support team for assistance.
feedbackastairs@gmail.com